How it works

Concrete is ordered by volume. A slab is a box, and a post hole is a cylinder. Add some extra for waste, then convert to cubic yards, cubic meters or bags.

The formulas

  • Slab = length × width × thickness
  • Post holes = π × (diameter ÷ 2)^2 × depth × number of holes
  • 1 cu yd = 27 cu ft; 1 cu ft = 0.0283 m³
  • Bags: typical yields printed on concrete-mix bags are 0.60 cu ft for 80 lb, 0.45 for 60 lb and 0.30 for 40 lb. Metric bags are scaled from the same yield per kilogram.

Worked examples

  • A 10 × 10 ft patio, 4 in thick: 33.3 cu ft = 1.23 cu yd, or 1.36 cu yd with 10% extra. That is 62 bags of 80 lb mix.
  • 4 post holes, 10 in wide and 36 in deep: 6.5 cu ft before waste, about 12 bags of 80 lb mix with 10% extra.

Frequently asked questions

How thick should a slab be?

Patios and walkways are usually 4 in (10 cm). Driveways are usually 4 to 6 in, and more for heavy vehicles. Follow your local code or an engineer for structural work.

Bags or ready-mix?

Bags suit small jobs. Above about 1 cubic yard (0.75 m³), a ready-mix truck is usually easier and often cheaper.

Why add 10% for waste?

Forms bulge, ground is uneven and some concrete is always left in the mixer. 5% to 10% is the usual allowance.